400,000 tpa ilmenite smelting complex for treating beach sands at Richards Bay, South Africa. The end products are Sorelmetal (high purity pig iron) and a high titanium dioxide content slag. Facilities include: a roaster plant, a coal charring plant, a smelter with two, 6 electrode-in-line furnaces of 105 MVA rating each and a slag processing plant.
Project Highlights:
Project Cost: R 250 million (1975) for the total project, including the mine and mineral separation plants for extraction of rutile, zircon and ilmenite concentrate, which was done by others.2 stack flues Client: Qit-Fer et Titane Inc. Location: Richards Bay, South Africa Start: Preliminary Engineering: 1974 Completion: Furnace Start-up: 1978
|
||||||||||||||