HATCH
   
corner image
项目经验
Hail Creek
Hail Creek 选矿厂,澳大利亚
Melt Shop & Caster Complex
熔炼车间和浇铸机组,加拿大,魁北克
Million Tonne Expansion
百万吨扩建工程,南非
Upgraded Slag Project
升级矿渣处理项目,加拿大,魁北克
Mine Upgrade Project
矿山升级项目,2000年,南非
更多...

工业矿产

项目
专业论文

相关文章

以下是关于赫氏公司矿产工业业务部的文章目录。如希望获得一篇文章,请直接联络作者并注明您想要通过E-mail收到的技术论文题目。

Process design considerations for the fluidized bed technology applications in the nickel industry
K. Adham and C. Lee

Operating Comparison of Three Differing Coal Processing Operations
P. Crisafulli, T. James, N. Drakeford

Development of South Walker Creek PCI Coal Mine
T. Crossley, H. Lief, P. Crisafulli

Prediction of Heat and Fluid Flow in the Slag Phase of an Electric Arc Reduction Furnace
L.H. Gunnewiek, S. Tullis

Clean Plant Design - A Case Study of Dust Control for an Industrial Mineral Processing Plant
S. Beaton, P. Julien, J. Gaudette, L. Palazzo

Automated Monitoring System for Emission Control Systems at Richards Bay Minerals
R.K. Makins, P. Naidu

Process Modelling of the Fluidized Systems Used for Charge Preheating in the Energy Efficient Electric Furnace
Kamal Adham, Cassandra Lee

Dynamics of Transient Heat Transfer Processes in Counter-Current Furnaces and Devices with Packed Layer of Burden Material
Y. Gordon, V. Shvidkiy, Y. Yaroshenko

Rail Wheel Squeal – Some Causes and a Case Study of Freight-Car Wheel Squeal Reduction
C.E. Tickell, P. Downing and C.J. Jacobsen

 

Copyright © 2010 Hatch Ltd. | privacy statement | contact webmaster